
Al Garhoud Bridge
جسر القرهود
Advendus estimate 10–20 min
Al Garhoud Bridge is a road bridge over Dubai Creek, completed in 1976.
It forms the eastern end of the Salik Road Toll.
The original structure was the second bridge to cross the Creek.
That old bridge had six lanes.
A replacement was constructed between 2006 and 2008.
The new bridge costs 415 million dirhams.
It is 520 m long and has 14 lanes.
The structure can handle 16,000 vehicles per hour.
Artwork on the bridge resembles sand dunes during the day and waves at night.





